4D Super NATM
Ensuring tunnel safety with 4D displacement prediction.
1. Displacement prediction based on tunnel progress ▻ Automatic conversion from CyberNATM irradiation time to progress data ▻ One-stop implementation from measurement data processing to displacement prediction 2. Measurement using TS-type 3D scanner ▻ Continuous and surface measurements are possible with a 3D scanner ▻ Survey coordinates can be assigned to instrument positions and 3D point clouds, eliminating the need for secondary processing 3. Numerical analysis table for each support pattern ▻ Automatic identification of displacement curves from the initial stage through 3D finite element analysis 4. Improvement of management quality ▻ Enables visualization of cross-sectional shapes and displacement distributions in 3D 【Features and Effects】 1. Simultaneous evaluation of both actual shape and prediction ▻ Allows comparison with design shapes, enabling not only prediction but also actual shape management 2. High-precision prediction ▻ Achieves high-precision predictions by understanding displacements in the early stages of excavation ▻ Can target deformations at arbitrary locations, allowing for an understanding of the anisotropy of ground strength 3. Diverse evaluation screens ▻ Provides various evaluation screens, including cross-sectional evaluations, grids, and 3D ▻ Allows for comparative analysis of information obtained from each screen, enabling correlational evaluations *For more details, please refer to the PDF document or feel free to contact us.
- Company:演算工房
- Price:Other